Planet TrotterFoundation
Smart Watershed Management Pilot
All Programmes
Concept / Proposed ProgrammeWater & Climate ResilienceSDG 6

Smart Watershed Management Pilot

A 50-node IoT sensor network and Azure ML dashboarding to optimise irrigation and guide community-run check dams across a watershed.

Watershed zone (200 sq km)Duration: 12 months

The Challenge

Hardware reliability in the field, data gaps, and adoption of new irrigation practices by farming households.

What We Are Trying To Do

Deploy an IoT sensor network across a watershed and use Azure ML to optimise irrigation scheduling and reduce water usage, alongside community-run check dams and recharge structures.

Who It Serves

5,000 downstream farming households across 10 villages in a critical watershed zone.

Key Activities

  • Install 50 IoT rain gauges, soil moisture sensors, and groundwater monitoring nodes
  • Build an Azure IoT Hub and ML pipeline for real-time water prediction and alerts
  • Create Power BI dashboards for Panchayat water committees and district officials
  • Train 20 local water managers in smart irrigation scheduling techniques
  • Construct 3 check dams and 10 recharge trenches guided by sensor data

Targets

Water saved

25% reduction in irrigation use (target)

Groundwater rise

+2m in dry season (target)

Crop yield

20% improvement (target)

Water managers trained

20 (target)

Infrastructure built

3 check dams + 10 recharge structures (target)

Training

20 local water managers proposed to be trained in smart irrigation scheduling.

Connects with the Water, Climate & Disaster Resilience and Digital, Technology & AI schools in Learn & Train.

Volunteering

10 volunteer IoT/AI engineers proposed via Microsoft Ask.

Partnership Opportunities

TechnologyCSR FundingTechnical ExpertiseInfrastructure

Microsoft Ask: Azure IoT credits ($40K), AI for Earth Water grant, 10 volunteer IoT/AI engineers, Power BI nonprofit licenses, sensor hardware co-donation.

Discuss This Programme

No verified results have been recorded for this programme yet. Targets above represent proposed goals, not achieved outcomes.